Piedmont Triad International Airport (GSO)

130 Bentley Road
Greensboro, NC 27409

Project Size

748,646 SF

Project Buildings

Building 218,200 SF
Apron 396,386 SF

Project Features

  • Ground lease with airport for maximum 50 years
  • Single tenant
  • Build to suit aircraft maintenance facility.
  • 748,646 SF in improvements
  • 6 bays dedicated to the maintenance, repair and overhaul of C-130s
  • 1 bay dedicated to painting C-130 aircraft
  • 42 foot tall hangar door
  • Aircraft maintenance capability for 7x C-130 aircraft.
  • Featuring aircraft ramp space of 396,386 SF
  • Space for Engine run ups, aircraft washing, defueling, and fueling area
  • Mechanical space, Office space, Locker-room, and breakroom
  • Parking for approx. 150 cars